TEST RECORD
- DATE
- November 22, 2026
- DESK
- PETROCHEMICALS
- READ TIME
- 2 MIN
- WORDS
- 455
DuPont OxyMem MABR modules land first US municipal job in Windsor, Calif.
Windsor, California picks DuPont OxyMem MABR modules for its water reclamation facility — the technology's first US municipal deployment, engineered with Black & Veatch for tighter nutrient limits.
SPECIFICATION
- 1
First US municipal deployment of DuPont OxyMem MABR modules, at Windsor WRF, Windsor, California
- 2
Project engineered with Black & Veatch Corp. (Overland Park, Kan.)
- 3
Targets stringent nitrogen and phosphorus discharge limits at a space-constrained site
- 4
DuPont Water Solutions technologies purify over 50 million gallons of water per minute in 112 countries
DuPont's OxyMem membrane aerated biofilm reactor (MABR) modules will get their first municipal deployment in the United States at the Windsor Water Reclamation Facility (WRF) in Windsor, California. The Town of Windsor picked the technology for an upgrade that must add nutrient-removal capacity without expanding a space-constrained site.
The plant operates under stringent nitrogen and phosphorus discharge limits. At the same time, it faces rising energy costs and long-term decarbonization targets. Windsor's answer is incremental: add treatment capacity in stages as flows and population grow, rather than build new basins. Black & Veatch Corp. (Overland Park, Kan.) engineered the project alongside DuPont.
How does MABR intensify an existing plant?
The mechanism is straightforward. MABR modules deliver oxygen through membranes directly to a biofilm that grows on the membrane surface, instead of bubbling air through the mixed liquor. That cuts aeration energy, which is typically the single largest energy draw in biological wastewater treatment.
DuPont positions the modules as drop-in process intensification: they raise nutrient-removal capacity inside existing tanks and infrastructure while lowering the energy the biological treatment step needs. That combination lets a utility push more load through the same footprint and shrink its greenhouse gas footprint at the same time — the stated goal for Windsor's biological nutrient removal (BNR) system and its net zero commitments.
Steve Ebersohl, Americas Commercial Leader at DuPont Water Solutions, framed the deal as a template for other utilities. "The Windsor WRF project marks an exciting milestone for OxyMem MABR modules in the United States," he said. "Utilities today are being challenged to do more with existing wastewater treatment infrastructure, and this project highlights how process intensification can help utilities meet the challenges of tomorrow through a more flexible, scalable approach to growth."
What does this change for buyers of treatment equipment?
Not much yet in volume terms, but the reference matters. The Windsor award adds to a growing portfolio of OxyMem installations and projects in North America and worldwide, and it gives DuPont a documented US municipal case at a plant dealing with the pressures most utilities now share: higher flows, population growth and tighter discharge permits.
For plant operators and their engineers, the sales argument is retrofit economics. If a modular MABR can lift nutrient removal inside existing tankage, utilities can defer or avoid capital-intensive civil works — relevant wherever sites are boxed in or permits are tightening.
DuPont Water Solutions claims its technologies purify more than 50 million gallons of water every minute across 112 countries, serving municipal water treatment, seawater desalination and industrial users with membranes, resins and complete systems. The business also develops products supporting electricity, lithium and green hydrogen production, where water and energy demands increasingly intersect.
via dupont.com (Original)
More from Sophie Lindqvist
Show full bio
News editor covering regulation, policy and their impact on Chemicals Weekly is the trade press at Chemicals Weekly.
53 articles